The void under a suspended floor is where damp problems hide longest.

Covering Dorset · Hampshire · Wiltshire

Book a survey for this issue

1/3

Takes under a minute. A qualified surveyor attends — never a salesperson.

What are you seeing in the property?

No obligation, no sales visit. Your details are used only to arrange the survey.

The problem

Victorian and Edwardian houses across Bournemouth, Poole and Southampton almost all have suspended timber ground floors over a ventilated void. Block up the airbricks, pile soil against the outside wall, or lay a solid floor in one room, and that void stops breathing.

Once it does, joist ends and bearers begin to decay quietly under a perfectly normal-looking floor. We open up, clear it out, repair the structure and get the airflow working again.

Proofterior technician at work
How we handle it

From first reading to registered guarantee

The same five stages on every job, whether it is one wall or a whole property.

  1. 01

    Access the void

    Boards lifted at strategic points to inspect joists, bearers, sleeper walls and oversite condition.

  2. 02

    Clear the oversite

    Builders’ debris, spoil and organic material removed so the void can ventilate and drain.

  3. 03

    Repair the structure

    Decayed joist ends and bearers replaced, sleeper walls repaired, hangers and DPC isolation installed.

  4. 04

    Restore ventilation

    Airbricks reopened, added or ducted through, with cross-flow across the full footprint.

  5. 05

    Reinstate the floor

    Boards relaid or renewed, levels corrected and finishes made good.

What is included

Everything this specification can cover

Your quotation lists only what your property needs. Anything not required is simply not on it.

Operative in full PPE stripping out a floor during subfloor works
  • Sub-floor void inspection and reporting
  • Oversite clearance and levelling
  • Joist, bearer and sleeper wall repair
  • Airbrick installation and periscope venting
  • Timber treatment and DPC isolation
  • Floorboard relaying and renewal
Questions

Subfloor Repairs — answered

Enough for cross-ventilation on opposing elevations — as a rule of thumb one every 1.5 to 2 metres of external wall, unobstructed and above external ground level.

Yes, and it is worth doing while the boards are up — but only with the ventilation path preserved, otherwise you create the exact conditions for decay.

Sometimes, but it changes how the walls handle moisture and can push damp sideways into the plaster. We would talk you through both options.

Operative in full PPE stripping out a floor during subfloor works
Complimentary survey

Get a written diagnosis before anyone quotes for subfloor repairs

A qualified surveyor attends, tests properly and writes it down. No obligation, no sales visit, no charge.

Dorset · Hampshire · Wiltshire